• <noscript id="4066u"><kbd id="4066u"></kbd></noscript>
  • <table id="4066u"><kbd id="4066u"></kbd></table>
  • <td id="4066u"></td>
    <li id="4066u"><option id="4066u"></option></li>

    News

    Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

    Date 2016-03-23

    (March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
     

    The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
     

    Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

     

    Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

    The Site of the Rajani-5 Well
     

    新不夜城论坛